Redline Roofing & ExteriorsCompare Artesia roofing quotes without the runaround.Free estimate

Artesia, CA

Replacing a roof in Artesia: what it takes

The price gap between the cheapest and the most expensive quote on the same roof is routinely forty per cent. That gap is not always quality, and it is never obvious from the paperwork.

Describe the replacement job

Three questions, then the address. Up to three Artesia contractors who do this work.

Free · Takes about a minute

Describe the replacement job

Three questions, then the address. Up to three Artesia contractors who do this work.

Step 1 of 6

What best describes your home?

Different buildings need different crews, so this is the first thing a roofer asks.

No cost to you. Contractors pay us, you do not.

Before you let anybody on the roof

The things worth pinning down on a replacement job. A contractor who has not raised them has not looked properly.

  • Which underlayment, and whether ice-and-water goes on the eaves and valleys
  • How the site is protected, and who cleans up the nails
  • A written per-sheet price for replacing bad decking
  • Tear-off or overlay, and what the local code allows
  • Ventilation: what is there now, what it should be

Ask how long the crew has been together. Roofing is a trade where the same company name can mean an entirely different set of hands from one season to the next.

A proper replacement is a tear-off, not an overlay. Going over the top of the old roof saves money on day one and costs it back at the next replacement, when there are two layers to remove and no way to inspect the deck.

The covering is the part you can see and the part everybody quotes on. The parts that decide whether the roof lasts are underlayment, ventilation, drip edge and how the valleys are handled.

Locally

Close behind that: morning fog that sits on the roof until mid-morning. It is why two identical houses on the same street can be ten years apart on the same roof, depending on which way they face.

About replacement here

How long does a re-roof take?

A straightforward asphalt roof on an average house is one to three days. Tile, slate and complex rooflines take longer, and weather stops work more often than anything else.

What does a new roof cost in Artesia?

Most quotes here for a standard asphalt replacement come in around $13,000 to $29,500. That assumes one layer to remove and sound decking. Every quote you get should say in writing what happens if the decking is not sound.

How long should a roof last here?

Rated life and real life are different numbers. Here, ordinary rated life is a fair guide, provided the attic breathes. Ventilation and the quality of the installation move that more than the brand does.

Are the contractors licensed and insured?

We require a licence number and current insurance from every contractor in the network. Verify it yourself anyway. Your state licensing board has a free lookup, and it takes two minutes.

Start with a free estimate

Three questions, about a minute, and up to three Artesia contractors come back to you.